search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

March 21, 2014

Closure of mail server

 

IMPORTANT NOTICE

On Friday the 28th March between 5am and 8pm (Danish time), we shut down our e-mail server.

This means that we cannot send e-mails during this period of time.

 

We will only have access to incoming mails after 8pm
(i.e. on Monday morning when we get back to Work)

If you want to get in touch with one of us on Friday,  kindly call us on
+45 63 18 60 00 instead.
We apologize for any inconvenience that the change of our server may mean to you.
Thank you for your understanding.

 

The ITW GSE AXA Power Team

 

 

 

 

 

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...