search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

March 28, 2018

Congrats Kotoka!

With the new installation at your capital airport. The installation of 14 pcs of ITW GSE 2400 Power Coils and 7 pcs of PCAs  looks very nice, clean and neat. Just as intended.
Hope that this green solution will save you money and support the surroundings.

2400 Power Coils and 3400 PCA at Kotoka Int'l Airport, Ghana

More news

Apr 21, 2022, posted in News

Celebrating the 100th unit of eGPU 90 kVA!

Hurray! Today, we celebrated the 100th produced unit of 90 kVA battery GPU, the ITW GSE 7400 eGPU. This unit is sold to TCR,...

Apr 05, 2022, posted in News

Proper Aircraft Cable Tension

The tension in the sockets of a GPU cable head are critical to the safety of the operators, equipment, and aircraft. Cables should be...

Mar 01, 2022, posted in News

Proud to present our Model Factory

Our facility is a true “model factory” in every aspect. From the Inlining of all assembly lines where products flow through from start to...

Feb 10, 2022, posted in News

Changing the Abrasion Resistance End Cap

Watch how easy it is to change an ITW GSE Abrasion Resistant End Cap!    These 400 Hz replaceable caps are made of a...