search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

March 16, 2017

Doug was here!

Service Technician, Doug Wood, from the ITW GSE Palmetto plant has just left Denmark after two weeks of product training. Before coming, Doug already was a very experienced person within pre-conditioned air as he has worked with Air-A-Plane, Trilectron and now ITW GSE PCA units for more than 30 years. What an achievement in itself! Anyhow, he expressed that he feels much more comfortable with the ITW GSE PCA after the training. This enables him to do an even better field support back home. Doug especially highlighted the day spent in the PCA climate chamber where we can do all kinds of product testing under conditions as similar as possible to the place of use. That day was indeed very helpful and beneficial.

During his stay, Doug has taken many notes and collected material that he will share with his colleagues in Palmetto. Seeing, touching, testing the products was an outstanding way to get them under the skin and to get to know the teams behind them better, Doug said before leaving.

As cross training is a focus area within ITW GSE’s global organisation in 2017, we look forward to more opportunities of exchanging knowledge in the months to come. As we say in ITW GSE:

It’s all about connnections

 

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....