search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

January 15, 2014

Information from Airbus on A380

In the latest edition of the  Airbus Aircraft Characteristics & Airport and Maintenance Planning manual, section 05-04-04 – it is stated that ” four 90 kVA GPU are necessary “. That is for normal turn around and for maintenance hangar operation

 

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...