The biggest order so far in AXA Power’s history
Sales Manager Mr. Poul Elvstrøm has concluded a major order for Doha Airport in Qatar.
The order includes 92 pcs of the AXA 2300 Compact GPU to be installed under the passenger boarding bridges. Delivery is scheduled for May 2009.
February 25, 2009
Major Order for Qatar
More news
May 07, 2026, posted in News
Modern air bases require more than infrastructure — they require integrated ground support
As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...
Apr 27, 2026, posted in News
Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions
ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...
Apr 23, 2026, posted in News
Charging bottlenecks aren’t about fleet size — they’re about system design
Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges: Charging doesn’t scale the same way....
Apr 14, 2026, posted in News
Noida International Airport prepares for take-off with electrified gate operations
As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...