search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

March 01, 2022

Proud to present our Model Factory

Our facility is a true “model factory” in every aspect.

From the Inlining of all assembly lines where products flow through from start to finish with no disruptions to our 6S process of sustaining our cleanliness and safety standards.

Last week, our segment leadership team joined us at our Palmetto, FL facility where they were able to tour our production process and shop floor. You can see parts of the tour in the photos.

Operations Manager, Clay Anderson states “I’m proud to present and represent this facility for our Segment in hopes that it inspires others to strive to achieve this same culture and concepts we are so proud of”.

You can learn more about us by clicking here.

itw gse factory tour

 

 

itw gse palmetto facility factory tour

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Mar 04, 2026, posted in News

EU Funding Is Accelerating Airport Electrification

How AFIF and TEN-T support investment in PCA and ground power European airports face increasing pressure to reduce emissions and improve energy efficiency. Alongside...