All time high !
During September 2011, AXA Power shipped 150 Ground Power Units and PCA units – among others the major batch for the new Terminal S4 at Paris Charles de Gaulle Airport, France.
October 10, 2011
September Result
More news
May 13, 2026, posted in News
Open job position – Spare Parts Coordinator
Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...
May 07, 2026, posted in News
Modern air bases require more than infrastructure — they require integrated ground support
As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...
Apr 27, 2026, posted in News
Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions
ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...
Apr 23, 2026, posted in News
Charging bottlenecks aren’t about fleet size — they’re about system design
Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges: Charging doesn’t scale the same way....