search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 27, 2016

Successful Factory Accceptance Test for ATR

ATR, Airbus and Fauche Technologies has participated in the Factory Acceptance Test of 7 x 400 Hz AXA 2400 &  7 x AXA 1400 28 VDC Ground Power Units. The units will power the ATR production in Toulouse. Both ATR and Airbus were very satisfied with the successful FAT as well as the performance of the units.  ATR is looking forward to the delivery soon.

The photo below shows:

Pernille Bo (AXA), Fabien Batut (ATR), Fabrice Cerezo (Fauche Technologies) Brian Hou (AXA), Jérôme Bassedes (AIRBUS), Bernard Kosmider (AXA) and Romain Tardieu (Fauche Technologies)

 

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Mar 04, 2026, posted in News

EU Funding Is Accelerating Airport Electrification

How AFIF and TEN-T support investment in PCA and ground power European airports face increasing pressure to reduce emissions and improve energy efficiency. Alongside...