search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

September 19, 2012

Factory Acceptance Test Salalah Airport, Oman

AXA Power will deliver 16 pcs of 90 KVA Ground Power Units to Salalah  Airport in Oman, which are planned to be put into operation during spring 2013.

On 17. September, we therefore performed a Factory Aceptance Test of those units.

The new terminal at Salalah Airport envisages an expansion of capacity to 1 million passengers annually by 2014. However, the airport has been designed to allow for further expansions up to 6 million passengers per year.

More news

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Mar 04, 2026, posted in News

EU Funding Is Accelerating Airport Electrification

How AFIF and TEN-T support investment in PCA and ground power European airports face increasing pressure to reduce emissions and improve energy efficiency. Alongside...

Feb 16, 2026, posted in News

Powering Progress at Leeds Bradford Airport

Leeds Bradford Airport (LBA) is advancing its net-zero ambitions by installing a new gate power solution featuring 8 x ITW GSE 2400 Power Coils...

Dec 29, 2025, posted in News

Reflecting on a Remarkable Year

As 2025 draws to a close, we would like to extend a heartfelt thank you to our partners, customers, and industry peers around the...