search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

September 23, 2016

AXA 2400 Installed at London Heathrow Airport

ITW GSE AXA Power’s UK Service Partner, JLC Aviation Services Ltd, have recently completed the upgrade of 3 x British Airways stands serving their B787-8 fleet of aircraft at their principal Maintenance Base at Heathrow Airport.

The photo shows 2 x AXA 2400 90 kVA GPUs  together with a cable crocodile which was retained from the former installation. An A380 aircraft supplies the background scenery!

A total of 6 x AXA 2400 90 kVA GPUs and 2 x AXA 90 kVA mobiles complete this project and compliment more than 60 AXA GPUs already in active service across the site

.

More news

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...