search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 10, 2018

Gamechanging eGPU – for greener airports

We are happy to introduce the newest member of the ITW GSE family, namely the ITW GSE 7400 eGPU that is  ideal for gates and hangars without fixed 400 Hz installations.

The ITW GSE 7400 is a true game changer in the ongoing quest for lowering the environmental impact at airports. Zero COand NOx emissions at the place of use and drastic reduction of noise is the key for achieving greener airports and better working environments. The 7400 GPU does just that!

The combination of two well-proven technologies i.e. Nissan Batteries at input and an ITW GSE solid-state converter at output has created the rock-solid eGPU. It has already been successfully tested at Amsterdam Schiphol Airports.

Find your way to a greener airport by clicking here

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...