search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 12, 2018

Power Coils for Madagascar

In collaboration with Bouygues Batiment International, ITW GSE is going to take part in the development of Ivato Airport at Madagascar. The project combines new green technology and enhanced quality in terms of safety and service. The new and greener terminal is set to open early 2020. It is a BOT project – (Build – Operate – Transfer) where Bouygues is not only building the airport, but they are also a share holder  and will be in charge of operation of the airport as well.

For the first time, Ivato Airport will get passenger boarding bridges (from Tianda). And those will be equipped with ITW GSE 2400  Power Coil – a smart two-in-one solution that holds a 400 Hz power unit + a cable coil in one enclosure. An aesthetic solution indeed, but also practical since the enclosure protects the cable from dust, hot temperatures and other weather conditions. As the power coil is a pure electrical unit, this will  contribute to the reduction of the CO2 emissions – and of the general noise level as well.

In the presence of M. BIZID Elyes, Electrical Design Manager at Bouygues and his colleague M. OLLIER Jean Philippe who manages the building on-site,  the Power Coil was examined, tested and accepted.

Visit from Madagascar

Did you know?

That Magagascar is the 4th biggest island in the world?
And that Ivato International Airport is also known by plenty of other names like: Madagascar Airport, Tana Airport and Antananarivo International Airport.
Passenger numbers around 1 mio.

More news

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...

Oct 09, 2026, posted in News

Growing with the team: New office space takes shape at ITW GSE

Our team has been growing – and now our facilities are growing with us. Over the summer, there has been plenty to follow just...