search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

June 14, 2018

Plug & Play makes a difference

Yesterday, on a bright and sunny day, we had the pleasure of welcoming ADP (Aéroports De Paris) for a factory test. The objective was to verify the voltage drop on different 400 Hz cable types that ADP uses on their Paris facilities, Roissy and Orly.

During the visit, we did various measurements and the ADP team could approve the choice of cable depending on the distance between the converter and the aircraft plug.

Thanks to ITW GSE’s patented Plug & Play system, the results of the various tests corresponded to the expectations – to be honest, they even proved to be better.

Visit from ADP

The photo shows from left to right: M. Bernard Kosmider, M. Alain Gargou, M.  Fernando Martins, M. Vincent Gibert, M. Gwenael Briand et M. Jérome Rouzies.

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....