search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

November 19, 2024

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months! 

  • Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery, cables, and connectors. Addressing any minor wear and tear now can prevent bigger issues when temperatures drop.
  • Optimize Battery Management: Cold weather can impact battery efficiency. Keep your eGPU batteries fully charged and consider indoor storage during non-operational hours to protect them from extreme cold.

The batteries charge faster at room temperature than at cold temperatures, so indoor charging is worth considering. Such preventive care helps ensure reliable ground support performance and maximizes overall eGPU operation and benefits
for aviation applications.

Preparing now means smoother operations all winter long. 

We are here to help you preparing your units, and you can reach out to us via our Training Academy or in the Support Universe.

More news

Jun 11, 2026, posted in News

Behind the Scenes: Understanding the Journey of Spare Parts

Getting the right spare part to the right location at the right time is an important part of supporting airport operations around the world....

May 22, 2026, posted in News

EU Airport Sustainability Goals Increase Demand for Flexible PCA Solutions

Airports across Europe are under increasing pressure to reduce emissions, improve energy efficiency, and accelerate the transition away from fossil-fuel-powered ground operations. New EU...

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...