search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 12, 2018

Power Coils for Madagascar

In collaboration with Bouygues Batiment International, ITW GSE is going to take part in the development of Ivato Airport at Madagascar. The project combines new green technology and enhanced quality in terms of safety and service. The new and greener terminal is set to open early 2020. It is a BOT project – (Build – Operate – Transfer) where Bouygues is not only building the airport, but they are also a share holder  and will be in charge of operation of the airport as well.

For the first time, Ivato Airport will get passenger boarding bridges (from Tianda). And those will be equipped with ITW GSE 2400  Power Coil – a smart two-in-one solution that holds a 400 Hz power unit + a cable coil in one enclosure. An aesthetic solution indeed, but also practical since the enclosure protects the cable from dust, hot temperatures and other weather conditions. As the power coil is a pure electrical unit, this will  contribute to the reduction of the CO2 emissions – and of the general noise level as well.

In the presence of M. BIZID Elyes, Electrical Design Manager at Bouygues and his colleague M. OLLIER Jean Philippe who manages the building on-site,  the Power Coil was examined, tested and accepted.

Visit from Madagascar

Did you know?

That Magagascar is the 4th biggest island in the world?
And that Ivato International Airport is also known by plenty of other names like: Madagascar Airport, Tana Airport and Antananarivo International Airport.
Passenger numbers around 1 mio.

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....