search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

September 17, 2026

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to help make better use of electrical capacity that is already available at the gate.

Adding dedicated charging infrastructure or increasing the electrical supply may not always be the first or most practical option. At the same time, the power already installed at the gate is not necessarily being used at full capacity throughout the entire aircraft turnaround.

That is where ITW GSE Power Share comes in.

ITW GSE Power Share - Tampa International Airport, US

Share available power – while keeping the aircraft first

Power Share makes excess gate power available to other electrical equipment while ensuring that the primary aircraft-related demand from GPUs or PCAs remains the priority.

When capacity is available, that power can be used for secondary equipment, including charging eGPUs and other electric Ground Support Equipment. If aircraft-related demand increases, Power Share adjusts accordingly.

The principle is simple: prioritize the aircraft and use of the remaining power smarter.

This creates additional charging opportunities at or close to the point of operation, helping airports and ground handlers make better use of existing electrical infrastructure.

See Power Share in airport operations

Watch the video to see ITW GSE Power Share in different airport settings and how available gate power can become part of a more flexible approach to charging electric GSE.

Want to explore how Power Share works?

Learn more about ITW GSE Power Share

More news

Nov 18, 2026, posted in News

How to Prepare Your eGPU for Winter: Two Essential Maintenance Tips

As temperatures drop, winter weather can bring additional challenges to airport ground operations. Preparing your electric Ground Power Unit (eGPU) for colder conditions is...

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...