search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

May 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Mar 04, 2026, posted in News

EU Funding Is Accelerating Airport Electrification

How AFIF and TEN-T support investment in PCA and ground power European airports face increasing pressure to reduce emissions and improve energy efficiency. Alongside...