search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

May 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

Sep 17, 2026, posted in News

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to...

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...

Aug 31, 2026, posted in News

Celebrating 40 years with ITW GSE

Congratulations to Kim Koustrup Pedersen on four decades of dedication, technical expertise and commitment to ITW GSE ITW GSE just celebrated an impressive milestone...

Aug 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 2-months...