search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

November 21, 2024

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions.

Some airports lack eGSE charging possibilities due to grid limitations, but most electric GPUs have excess electrical capacity at the input due to many aircraft not drawing a full load. The Power Share lets you use that excess power from the grid without having to upgrade the gate infrastrucutre as it distributes the power efficiently to your eGPU or other charging applications. Combining an ITW GSE 2400 GPU with a Power Share allows more 50/60Hz AC equipment to be charged even when the GPU is supplying 400Hz power to the aircraft.

power share and 7400 eGPU

The eGPUs now have the option of an AC Type two inlet that eases the charging in the cases where airports already have installed AC wall chargers incl. cables. Soon, a CCS2 DC inlet will also be an option to the 7400 eGPU.

 

Watch the video to hear Jose explain about the different solutions that we showcase at this year’s GSE Expo Europe in Lisbon

 

The latest addition to our charging solutions is the DC Charger, which lets you charge your high-voltage eGSE. It features two 60 kW (CCS2) outlets and can be connected to an ITW GSE 2400 GPU, which controls how much power the charger has available. This means you don’t need to upgrade your existing infrastructure – and it fits seamlessly into a complete eGPU family for aviation

Martin Walsted poses with ITW GSE’s new DC Charger
Martin Walsted, Key Account Manager, posing with the ITW GSE DC Charger at GSE Expo Europe

 

More news

Mar 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Mar 04, 2026, posted in News

EU Funding Is Accelerating Airport Electrification

How AFIF and TEN-T support investment in PCA and ground power European airports face increasing pressure to reduce emissions and improve energy efficiency. Alongside...

Feb 16, 2026, posted in News

Powering Progress at Leeds Bradford Airport

Leeds Bradford Airport (LBA) is advancing its net-zero ambitions by installing a new gate power solution featuring 8 x ITW GSE 2400 Power Coils...

Dec 29, 2025, posted in News

Reflecting on a Remarkable Year

As 2025 draws to a close, we would like to extend a heartfelt thank you to our partners, customers, and industry peers around the...