search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 14, 2026

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to support efficient, safe, and future-ready aircraft turnaround.

10 gates have been equipped with integrated ground support equipment from ITW GSE, including 2400 Power Coils, 3500 Pre-Conditioned Air units (PCA), and 3500 Air Coils — all installed directly at the contact gate.

 

Built for efficiency from day one

Noida International Airport is being developed by Yamuna International Airport Private Limited (YIAPL). YIAPL is a 100% subsidiary of Zurich Airport International AG established to oversee the development, construction, and operation of the greenfield Noida International Airport project. This foundation has enabled the airport to be designed with efficiency in mind from the outset.

Our objective was to equip the gates with efficient and reliable ground support equipment that supports safe operations, optimizes turnaround, and fits the airport’s long-term vision for modern, electrified infrastructure.”

With power and pre-conditioned air available directly at the aircraft, the airport is positioned to streamline turnarounds while reducing emissions and operational complexity.

itw gse 3500 pca and itw gse 2400 power coil

Integrated solutions for smoother turnaround

The installation combines three core technologies:

  • 2400 Power Coil – stable 400 Hz power at the aircraft
  • 3500 PCA – pre-conditioned air to reduce APU usage
  • 3500 Air Coil – efficient and safe hose management

Together, these solutions enable a more predictable and efficient turnaround process, with less equipment handling on the apron.

Having ground support equipment directly available at the gate simplifies daily operations and supports a more consistent turnaround flow.”

 

A scalable foundation for growth

The current setup supports Phase 1 of the airport and the proposed terminal 1 building is designed to cater to a total of 10 passenger boarding bridges with traffic of 12 million passengers annually.

As development continues, Noida International Airport is envisioned to become one of Asia’s largest airports — making scalable and efficient gate infrastructure essential.

 

Enabling the shift to electrified operations

For ITW GSE, the project reflects a broader industry transition.

As airports electrify their operations, integrating power and air supply at the gate is key to improving efficiency and reducing infrastructure strain,” says ITW GSE.

Solutions that bring power and cooling directly to the aircraft help airports meet growing demands for efficiency, sustainability, and operational reliability.

itw gse 3500 pca and itw gse 2400 power coil

More news

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...